Fastned and TfL's property arm have opened a second 400kW EV charging hub, at East Finchley, and won consent for five more. None of the five is in Lewisham.

Lewisham drivers without a driveway will not find one of Transport for London’s new ultra-rapid charging hubs in the borough any time soon. Places for London, TfL’s property company, and the charging operator Fastned opened their second hub this month in the car park of East Finchley Underground station, and say building will start in 2027 at five more: Dagenham Dock, Hillingdon, Hounslow East, Redbridge and West Barking. None of them is in Lewisham or anywhere else south of the Thames.

The two companies want to reach up to 25 hubs by 2030. The release does not name the sites beyond this round.

Overview

  • Open now: Hatton Cross near Heathrow (since April 2026) and East Finchley station car park on High Road (opened this month).
  • Charging speed: 400kW, which TfL says adds up to 100 miles of range in five minutes for a compatible vehicle.
  • Next: construction due in 2027 at five sites with 66 bays in total, plus a 36-bay hub at Hanger Lane in Ealing due to open in spring 2027.
  • Lewisham: not among the sites named.
  • Target: up to 25 hubs by 2030.

Why it matters for an inner London borough

TfL’s Travel Demand Survey, quoted in the release, found that 93 per cent of inner London households have no private off-street parking, against 64 per cent in outer London. That is the gap the venture says its hubs are meant to fill, for residents as well as commuters, taxis, private hire drivers and business fleets.

On Lewisham’s own streets, electric cars already pay a lower pay-to-park rate than petrol ones; our Lewisham parking guide has the zone hours and charges.

Seb Dance, Deputy Mayor for Environment and Energy, said: “To tackle the climate crisis, clean up our air, and build a net-zero city, we must make switching to electric vehicles seamless for every Londoner. The Mayor’s goal is for London to have 40,000 EV chargers by 2030 and the incredible momentum achieved by Fastned and Places for London proves what can be achieved when bold ambition meets rapid delivery.

“From Hatton Cross to East Finchley, and with monumental sites like Hanger Lane coming soon, this roll-out is vital for the thousands of drivers who don’t have access to a driveway. Together, we are hitting our stride and ensuring London remains at the global forefront of the green transport revolution as we continue to build a fairer and greener London for everyone.”

The two hubs already open

The East Finchley hub has eight bays in the Northern line station’s car park. TfL says it took eight months from planning consent to opening, and it is the first of the venture’s sites with Fastned’s yellow solar wings.

Hatton Cross, the first hub, opened in April 2026 and supported more than 1.1 million zero-emission kilometres in its first six months, the release says.

All the sites run on 100 per cent renewable energy, according to TfL, and have extra-wide bays, clear sightlines and lighting, 24/7 multilingual support and fully accessible spaces in line with British Standards Institution guidance.

A Fastned sign and a Places for London sign in front of a charging hub with a yellow solar canopy, beside Hatton Cross bus station, with a yellow car driving past
The Fastned hub at Hatton Cross, the joint venture's first site. Photo: Transport for London press office

Tom Hurst, UK Country Director at Fastned, said: “We are building real momentum across London. In less than a year, we’ve proven that well-designed, ultra-rapid charging changes the game for drivers. With Hatton Cross answering a critical local demand, East Finchley now welcoming drivers, and our game-changing 36-bay Hanger Lane flagship taking shape, we’re showing what the future of urban charging looks like.

“Securing planning for key sites in Barking and Dagenham, Hillingdon and Redbridge gives us the springboard to accelerate even faster. Drivers want fast, reliable, safe charging that fits naturally into their day. Alongside Places for London, we are proud to be turning that vision into a reality across every corner of the capital.”

Where the next hubs go

Nine planning consents are in hand and decisions on three more are awaited. Construction at these five is due to begin in 2027, taking the network to eight sites and 122 bays:

  • Dagenham Dock: a 16-bay flagship hub with a retail unit.
  • Hillingdon: 12 bays in the station car park.
  • Hounslow East: 8 bays in the station car park.
  • Redbridge: 12 bays in the station car park, just off the A406.
  • West Barking: 18 bays with a retail unit.

Building is already under way at Hanger Lane, on unused land in the Park Royal industrial estate, using fully electric cement mixers. With 36 bays, a shop, toilets and outdoor seating, it is due to open in spring 2027 as London’s largest ultra-rapid EV charging destination.

A computer-generated aerial view of a charging hub with zigzag yellow solar canopies, a parking area, picnic tables, a Fastned building and a cycle lane alongside
A computer-generated image of the planned Hanger Lane hub in Park Royal. Image: Transport for London press office

John Colgan, Electric Vehicle Charging Hubs Programme Manager at Places for London, said: “Seeing our joint venture with Fastned move at such a pace is hugely exciting. By unlocking TfL’s estate, we are transforming accessible land into critical, sustainable infrastructure where the capital needs it most.

“With two hubs live, work progressing rapidly at Hanger Lane, as well as a robust pipeline moving smoothly through planning, we are setting a benchmark for world-class EV infrastructure. Every new bay we deliver helps decarbonise our transport network, supports local air quality, and generates revenue to be reinvested directly back into London’s transport system.”

London’s charging numbers

  • London has more than 29,500 public charging devices, around a third of the UK’s, of which more than 2,000 are rapid or ultra-rapid.
  • TfL projects 860,000 to 1,049,000 electric vehicles on London’s roads by 2030, 29 to 36 per cent of cars and vans.
  • It expects around 43,000 to 51,000 more charge points to be needed, several thousand of them 50kW or faster.
  • It estimates the growth in electric vehicles, with the charging to support it, could cut London’s annual carbon emissions by 1.5 million to 2.6 million tonnes by 2030.

TfL says it is also working with other charge point operators to add rapid and ultra-rapid bays across its estate. Places for London’s recent report on its property schemes named no Lewisham scheme either.

Source: Transport for London press office.